Court Allows Expert Testimony Regarding Measured Mile Analysis Comparing Work on Different Projects

By John Mark Goodman on June 20, 2023
Email this postTweet this postLike this postShare this post on LinkedIn
Close up of unrecognizable worker drawing on wood plank.

Loss of productivity damages are commonly estimated using a “measured mile” analysis, which compares unimpacted construction work to work which has been disrupted to determine the cost impact of the disruption. Such analyses often require expert testimony that must satisfy the reliability requirements of Rule 702 and Daubert. Generally speaking, to be reliable the analysis must compare work that is “reasonably similar.” As a Colorado federal court recently held, that does not mean the unimpacted and impacted work must be from the same project.  See Agri-Systems v. Structural Technologies, LLC, 2023 WL 3481397 (D. Colo. May 16, 2023). 

In Agri-Systems, the defendant moved in limine to exclude the plaintiff’s measured mile analysis because it compared work on different projects. The Court rejected the argument that to be reliable a measured mile analysis must compare work on the same project. Id. at *10 (citing Appeal of P.J. Dick Inc., VABCA 5597 et al., 2001-2 BCA ¶31,647 (concluding that an expert’s measured mile analysis was “reasonable and valid” where labor, materials, weather conditions, and area of installation were the same between two projects despite some differences). The defendant also pointed to other differences, including the location (Colorado v. Oklahoma), the quantity of men and equipment required, and the type of reinforcing materials (post-tensioning cables v. rebar). The Court noted that the plaintiff’s expert had identified many of these differences and provided detailed explanations for why they did not defeat the analysis. As such it did not appear that the expert’s selection of the other project for comparison was “arbitrary or chosen to achieve a predetermined result.” Id. citing Daewoo Eng’g and Constr. Co., Ltd. v. United States, 73 Fed. Cl. 547, 580–81 (2006). The Court further held that any unexplained differences between the two projects would go to the weight given to the testimony and not its admissibility. 

Photo of John Mark Goodman John Mark Goodman

John Mark Goodman is a construction lawyer and litigator who has tried cases throughout the United States and abroad. He regularly represents contractors, subcontractors, owners, and others involved with construction disputes, but he also handles a variety of non-construction disputes when called upon.

John Mark Goodman is a construction lawyer and litigator who has tried cases throughout the United States and abroad. He regularly represents contractors, subcontractors, owners, and others involved with construction disputes, but he also handles a variety of non-construction disputes when called upon. A degreed engineer, John Mark enjoys helping clients work through disputes that are often technical and complex.

Read more about John Mark GoodmanEmail
Show more Show less
  • Posted in:
    Business and Commercial
  • Blog:
    BuildSmart
  • Organization:
    Bradley Arant Boult Cummings LLP
  • Article: View Original Source

Call us at 1-800-913-0988 or email sales@lexblog.com.

Facebook LinkedIn Twitter RSS
The Library at LexBlog
  • About LexBlog
  • The Field We Built
  • Library at LexBlog
  • Our Beliefs
  • Our Team
  • Contact LexBlog
  • Disclaimer
  • Editorial Policy
  • Terms of Service
  • Get Started
  • Publishing Solutions
  • Compass
  • Submit a Request
  • Support Center
  • System Status
Copyright © 2026, LexBlog, Inc. All Rights Reserved.
Law blog design & platform by LexBlog LexBlog Logo