D.C. Circuit Upholds FERC Interpretation of PURPA Size Limitation Based on “Send out” to Point of Interconnection

Antonia Douglas · Russell Kooistra · Washington Energy Report · Published March 3, 2023

Work details

firm or organization
Troutman Pepper Locke
published
2023-03-03

Citation

Antonia Douglas, Russell Kooistra, D.C. Circuit Upholds FERC Interpretation of PURPA Size Limitation Based on “Send out” to Point of Interconnection, Washington Energy Report (March 3, 2023) [The Library at LexBlog, LEX-WK-98ACC8XX, lexpid.org/98ACC8XX]