LEX-WK-98ACC8XXcrawled 2026-09-15 12:48Z
D.C. Circuit Upholds FERC Interpretation of PURPA Size Limitation Based on “Send out” to Point of Interconnection
Antonia Douglas · Russell Kooistra · Washington Energy Report · Published March 3, 2023
Work details
- author
- Antonia Douglas · Russell Kooistra
- firm or organization
- Troutman Pepper Locke
- publication
- Washington Energy Report
- practice area
- Administrative and Regulatory · Energy and Utilities
- published
- 2023-03-03
Citation
Antonia Douglas, Russell Kooistra, D.C. Circuit Upholds FERC Interpretation of PURPA Size Limitation Based on “Send out” to Point of Interconnection, Washington Energy Report (March 3, 2023) [The Library at LexBlog, LEX-WK-98ACC8XX, lexpid.org/98ACC8XX]