Two common ways of pricing for construction contracts are fixed rate and costs plus.

Fixed rate is a single price which incorporates all the costs (materials, labor, overhead) and profit. Costs plus has two prices: the estimate base cost (material, labor, overhead) and has the profit as a separate price and additional fee.