A Stop Work Order is a legal tool used by project owners to shut down work on a construction jobsite until the issue is fixed or the parties reach an agreement. Provisions for Stop Work Orders are typical in federal and state contracts, and are often included in private contracts as well. 

Stop Work Order in Construction Contracts

Generally speaking, your construction contract will determine whether or not you’re susceptible to a Stop Work Order while on a project. If an SWO clause is part of your contract, the owner or an agent of the owner can issue an SWO for any of the reasons outlined therein.

Essentially, if the inspector doesn’t like what they see, they can issue an SWO. These guidelines apply to most cities, give or take a detail or two.

A Stop Work Order is different from a Stop Notice, which is a tool used by contractors in the event that they are not paid. But they can be just as expensive, both in terms of penalties and a loss of time or payment.

Stop Work Orders & FAR

Federal contracts use the Federal Acquisition Regulation (FAR) to govern non-commercially available goods and services like construction. These contracts almost universally use the FAR Stop-Work Order Clause (FAR 52.242-15), which says: 

“The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. 

“The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage.”

This clause gives the project’s top management the ability to stop work at any time for a variety of reasons, including: 

  • Safety concerns
  • Engineering changes
  • Production issues
  • Any other time suspending work is necessary

It’s important to note that a Stop-Work Order is not a replacement for a termination notice.

Stop Work Orders for State & Municipal Construction

Most state public works projects will also be subject to Stop Work Order provisions, typically for violations of contractor licensing, building permits, safety, or any other breach of the law. 

For example, in California, the Contractor State Licensing Board (CSLB) has authority to issue a Stop Order where there is no workers’ compensation insurance coverage for employees. 

The municipal or city government may govern these orders as well. Contractors should check their construction contract and local ordinances to understand the requirements and process after a Stop Work Order has been issued. 

For example, NYC Department of Buildings states a Stop Work Order may occur when “inspectors determine the work is in violation of Construction Codes, Zoning Resolution, or any law or rule enforced by the Department; and when work on a site is being done in an unsafe manner.”

Types of Stop Work Orders

Not all SWOs require you to turn out the lights and lock the doors. Depending on what the issue is that caused the stop, you might receive a full or a partial order.

A full Stop Work Order shuts down the entire jobsite. Everyone on the job has to pack it in and head home. There are a number of reasons why an agency might issue a full Stop Work Order.

If there were engineering, design, or financial concerns, a Stop Work Order will bring the site to a halt until the management is able to resolve the issue. Egregious safety violations could also result in a full Stop Work Order.

A partial Stop Work Order shuts down a portion of the jobsite, allowing other work to continue. This may be an option when there are issues with a certain contractor, a particular aspect of the design is changing, or there are safety issues that need addressing.

Regardless of the type of SWO, the only work typically allowed to continue is remedial work to address the issue at hand. All other work must cease right away.

Penalties

Whether it’s a full or partial stop, you need to abide by it. The situation needs resolving before work can continue. If you decide to keep working and violate the work order, you can expect a penalty in the form of a hefty fine.

For example, in New York City, if your site receives a full Stop Work Order, and one of the trades decides to keep working, they will likely receive a violation accompanied by a $5,000 fine for a first offense.

Penalties for subsequent offences can reach $10,000 each, not including the cost of the paperwork and filing required to have the SWO lifted.

How to Lift a Stop Work Order

When work stops on a jobsite, project and payment delays affect everyone on the job. The violator should make an effort to lift the order as soon as possible. These are the general steps to follow to get back to work.

1. Correct the violations

The first step in having an SWO lifted is to correct the issue. If you caused the issue, handle it immediately. If your subcontractor caused the issue, make sure they fix it and that you hold them accountable by back charging them if need be.

There’s only one option if the SWO is the result of code non-compliance: Redo the work, even if it’s expensive. You need to handle the issue properly.

If you’re cleaning up another sub’s mess, it’s likely in your best interest to request a change order to account for your time and labor.

2. Request re-inspection from the issuing agency

Once you’ve fixed the issue, you need to request a re-inspection from the issuing agency before they’ll lift the SWO. 

You’re somewhat at the mercy of the inspecting agency at this point. You’ll need to make an appointment and wait for the inspector to arrive. Expect a pretty thorough going-over, as well.

3. Pay the fees

Once the inspector certifies the corrections, the violator must pay any applicable fines and penalties. In some jurisdictions, this step may even require a hearing to determine appropriate fees and penalties.

Document the process

A critical part of the Stop Work Order process is documenting your work and all correspondence. It serves as the basis for effective communication that helps you to protect your bottom line.

It’s important to maintain a proper paper trail that includes all of the costs and steps to comply with the SWO. Documentation can help prove that sub-tier parties were aware of the situation. This may help avoid some liability in the form of fines and penalties. Proper documentation may play a significant role when it comes time for reimbursement as well.

The post Stop Work Orders: What Contractors Need to Know appeared first on Levelset.