Skip to content

Menu

LexBlog, Inc. logo
NetworkSub-MenuBrowse by SubjectBrowse by PublisherJoin the NetworkGet StartedSubscribeSupport
Contact Us
Search
Close

How Construction Attorneys Can Help Entities Benefit From California’s Newly Adopted Potable Water Regulations

By Bob Gallagher, MK Houston, Anna Wildeman, Alexander Bulkin, Alexander Downs & Alex Martinez on April 10, 2024
Email this postTweet this postLike this postShare this post on LinkedIn

Like much of the western and southwestern U.S., California has experienced drought conditions on and off for decades. Fortunately, the regulatory landscape is starting to catch up with water treatment technology, paving the way for states and localities to effectively create a new and reliable supply of potable water.

Since 2010, the California State Water Resources Board (the Board) and the California State Legislature (the Legislature) have studied the potential use of an emerging water recycling process known as direct potable reuse (DPR). DPR treatment involves an extensive, innovative, six-part filtering process that results in treated water being directed immediately back into the municipality’s drinking water supply.

Only one other state — Colorado — has enacted regulations at the state level that explicitly authorize DPR, but other states such as Florida and Arizona are following suit. State authorization is an important step, and it means that municipalities and drinking water treatment operators can evaluate DPR with a backdrop of regulatory certainty, and the public can be confident that the water supply is safe.

DPR stands in contrast to the indirect potable reuse (IPR) recycling method. In IPR, wastewater is: (i) filtered (to a lesser extent than DPR), (ii) directed into a “buffer” body of water (sometimes many miles away from the initial treatment plant), and (iii) converted to potable water at a local treatment plant. The benefits of using DPR include reducing reliance upon imported water, preserving buffer bodies of water (especially in times of drought), minimizing the need for building extensive pipeline systems to transfer treated water to buffer bodies of water, and providing a means of water production even during natural disasters in some cases.

On December 19, 2023, the Board adopted regulations authorizing local agencies to apply DPR treatment. The Board’s newly adopted DPR regulations are pending final review by California’s Office of Administrative Law before taking effect. But once published later this year as Article 10 of Chapter 17, Division 4, Title 22 of the California Code of Regulations, local agencies may begin using DPR treatment.

At its core, Article 10’s 63-page framework establishes important guidelines:

  • Treatment Guidelines: Provides (i) maximum levels of certain agents or contaminants in DPR water, (ii) reporting requirements during every interval of the DPR process, and (iii) permitting requirements to allow for the use of DPR by a local water agencies. See Draft Regulations of Cal. Code Regs., Tit. 22, Ch. 17, Art. 10, “Draft Regulations” §§ 64669.60, 65, 90 (Oct. 4, 2023).
  • Construction Guidelines: Requires coordination with design and engineering professionals to ensure that the “design and operation of the entire [DPR] treatment train … and connected facilities such as storage tanks, detention basins, reservoirs, related pipelines, and water conveyance … provide continuous mixing of the [water] flow along the path of flow between the terminus of the wastewater collection system and the entry point to the drinking water distribution system.” See Draft Regulations, § 50.
  • Engineering Guidelines: Requires an engineer to verify that the entity seeking to implement DPR has the appropriate infrastructure in place to comply with Article 10 and re-verify compliance therewith every five years. § 64669.75.
  • Funding Guidelines: Allows local water agencies to develop an agreement with a “partner agency” (defined as a “wastewater management agency, wastewater collection agency, public water system, or any other entity responsible for water treatment, water conveyance, or storage) to help share the costs of implementing DPR. § 64669.20.

Entities interested in implementing DPR should consider the feasibility of: (i) remodeling their current facilities, (ii) building new facilities for DPR infrastructure, (iii) establishing partner agreements with other entities to spread the initial and long-term costs, and/or (iv) qualifying for certain funding such as California’s Water Recycling Funding Program.

Public-private partnerships for construction projects — i.e., those between states and municipalities and private companies — could also help make implementing DPR more feasible. For instance, the public-private partnership model helps spread initial and long-term costs and reduces the amount of public money that would otherwise be tied up.

In California, a “governmental agency may solicit proposals and enter into agreements with private entities” to design and construct “fee-producing infrastructure projects … [including] sewage treatment, disposal, and water recycling.” Cal. Gov’t Code § 5956.4. As with most public-private partnerships, entities seeking to engage in a public-private partnership transaction will also have to navigate compliance with various legal requirements such as such as procurement and labor-law requirements. Considering the complex legal landscape among both the new DPR regulations and public-private partnership laws, agencies interested in implementing DPR are encouraged to consult with an attorney at the firm to help provide guidance and counseling to make DPR a reality.

Photo of Bob Gallagher Bob Gallagher

Bob Gallagher has represented construction clients on projects up to $4.5 billion and in dispute proceedings across 31 states, the District of Columbia, Canada, South America, the Middle East, Europe, and Australia.

Read more about Bob GallagherEmailRobert's Linkedin Profile
Photo of MK Houston MK Houston

MK is counsel in the Capital Projects + Infrastructure Practice Group. Her practice focuses on the development, acquisition, and financing of large-scale infrastructure assets. MK has represented sponsors, infrastructure funds, commercial banks, institutional lenders, and contractors in the development, construction, financing, and operation

…

MK is counsel in the Capital Projects + Infrastructure Practice Group. Her practice focuses on the development, acquisition, and financing of large-scale infrastructure assets. MK has represented sponsors, infrastructure funds, commercial banks, institutional lenders, and contractors in the development, construction, financing, and operation of projects in the air, road, rail, social infrastructure, water, and renewable energy sectors. She has first-hand knowledge of the project and financing documentation for some of the most innovative, landmark infrastructure projects in the United States and Caribbean, including public-private partnerships.

Read more about MK HoustonEmailMK's Linkedin Profile
Show more Show less
Photo of Alexander Downs Alexander Downs

Alex is an associate in the firm’s Construction practice. Alex earned his J.D. from the University of Pittsburgh School of Law, where he served as Editor-in-Chief of the University of Pittsburgh Law Review. While in law school, Alex also served as a

…

Alex is an associate in the firm’s Construction practice. Alex earned his J.D. from the University of Pittsburgh School of Law, where he served as Editor-in-Chief of the University of Pittsburgh Law Review. While in law school, Alex also served as a Research Assistant to Professor Jules Lobel.

Read more about Alexander DownsEmail
Show more Show less
  • Posted in:
    Real Estate & Construction
  • Blog:
    Constructlaw®
  • Organization:
    Troutman Pepper Locke
  • Article: View Original Source

Call us at 1-800-913-0988 or email sales@lexblog.com.

Facebook LinkedIn Twitter RSS
  • About LexBlog
  • The Field We Built
  • Our Beliefs
  • Our Team
  • Contact LexBlog
  • Disclaimer
  • Editorial Policy
  • Terms of Service
  • Get Started
  • Publishing Solutions
  • Compass
  • Submit a Request
  • Support Center
  • System Status
Copyright © 2026, LexBlog, Inc. All Rights Reserved.
Law blog design & platform by LexBlog LexBlog Logo