Contract’s Silence on the Southwest Bank Sinks Differing Site Condition Claim

By Lee-Ann C. Brown & John Mark Goodman on July 27, 2026
Email this postTweet this postLike this postShare this post on LinkedIn
Contract's Silence on the Southwest Bank Sinks Differing Site Condition Claim

Table of Contents

  • Background
  • Differing Site Conditions Claims
  • Hamp’s Construction’s DSC Claims:
  • Takeaways

The U.S. Court of Appeals for the Federal Circuit recently affirmed a decision of the Armed Services Board of Contract Appeals (ASBCA) denying a contractor’s differing site condition claim on a flood control project along the Trapp Canal in Jefferson Parish, Louisiana. Hamp’s Construction LLC v. Secretary of the Army, No. 2024-1528 (Fed. Cir. June 30, 2026).

The decision is a reminder that a Type I differing site condition claim requires a contractor to show that the actual conditions materially differed from what the contract documents expressly indicated for the specific location at issue.

Link to Background Background

The solicitation for the project included canal cross-sections and 10 boring logs taken in 2008, most of them from the east side of the canal. Work proceeded smoothly on the northern portion of the project. But when Hamp’s Construction reached the southwest bank in 2013, it encountered a collapsed section of bank and several other areas of slope failure. Concluding that it could not safely operate loaded trucks there, the contractor switched to barge-based equipment, resulting in significant delays and additional costs.

Hamp’s Construction sought an equitable adjustment and later submitted a certified claim, asserting a Type I differing site condition. The ASBCA denied the claim, finding that although the contractor was surprised by the conditions, it had not shown that those conditions contradicted any representation in the contract.

Link to Differing Site Conditions Claims Differing Site Conditions Claims

Contractors that encounter unexpected conditions may assert what is commonly known as a differing site condition (DSC) claim.  These claims generally seek additional time, compensation, or both to address unforeseen conditions.  As with any contract claim, entitlement depends on the facts of the case, the language of the contract, and the applicable law.

Federal government construction contracts typically incorporate the standard differing site conditions clause found in Federal Acquisition Regulation (FAR) 52.236-2.  That clause recognizes two types of differing site conditions:

Type I: Subsurface or latent physical conditions at the site differing materially from those indicated in the contract; or

Type II: Unknown physical conditions at the site that are unusual in nature and differ materially from those ordinarily encountered and generally recognized as inhering in the type of work contemplated by the contract.

The FAR requires the contractor to promptly notify the contracting officer before disturbing the conditions.  The contracting officer then investigates the conditions and determines whether an equitable adjustment is warranted. If the contractor disagrees with the contracting officer’s decision, it may appeal to the appropriate board of contract appeals and, ultimately, to federal court.

Link to Hamp’s Construction’s DSC Claims: Hamp’s Construction’s DSC Claims:

For reasons that are not entirely clear, Hamp’s Construction pursued only a Type I DSC claim.  The threshold issue for such a claim is whether the contract indicated the conditions that would be encountered at the specific location and whether the actual conditions materially differed from those indications.

Hamp’s Construction argued that three sources satisfied that requirement: (1) the boring logs, (2) the contract drawings, and (3) the original solicitation language. The Federal Circuit rejected each argument.

Boring logs. The court agreed with the Board that substantial evidence showed conditions on the southwest bank were significantly worse than elsewhere along the canal. The record included expert testimony, steeper cross-sections on the west bank, and pre-bid photographs taken by Hamp’s Construction’s subcontractor suggesting a history of slope failures. Given those differences, boring logs from other portions of the project did not constitute indications of the conditions that would be encountered on the southwest bank.

Contract drawings. Hamp’s Construction also argued that the contract drawings depicted construction traffic on the southwest bank. The Federal Circuit held that the argument was forfeited because it had not been meaningfully raised before the Board. Moreover, the argument lacked support because the drawings themselves were not included in the appellate record.

Pre-amendment solicitation. Hamp’s Construction further argued that the original solicitation prohibited the use of marine equipment, thereby indicating that the banks were suitable for land-based operations. That provision, however, had been rescinded by amendment before bids were submitted and therefore did not govern the work. In addition, Hamp’s Construction had disclaimed reliance on the original solicitation before the Board, preventing it from relying on that language on appeal.

The Board found and the Federal Circuit agreed that Hamp’s Construction had a “strong case that it was surprised” by the conditions on the southwest bank. Neither tribunal disputed that the contractor encountered genuine problems. Nevertheless, the claim failed because Hamp’s Construction could not show that the government had made any representation about conditions at that specific location that proved inaccurate. Because the contract document was silent regarding the southwest bank, Hamp’s Construction’s Type 1 DSC claim failed.

Link to Takeaways Takeaways

Contractors pursuing a Type I differing site condition claim should focus on establishing that the contract affirmatively indicated conditions at the specific location where the differing condition encountered. General information drawn from other portions of a project — even nearby ones — may not suffice where the evidence shows materially different subsurface or site conditions across the project.  A full copy of the court’s decision is available here. 

If you are considering or defending a differing site conditions claim, please give any of Bradley’s construction lawyers a call.  Our #1 ranked construction practice group regularly handles these types of claims and would be happy to review your case. 

Photo of Lee-Ann C. Brown Lee-Ann C. Brown

Lee-Ann Brown focuses her practice on construction and government contracts. She represents general contractors, subcontractors, sureties, and owners, in both the prosecution and defense of claims on public and private construction projects. In her construction practice, she has represented and counseled contractors in…

Lee-Ann Brown focuses her practice on construction and government contracts. She represents general contractors, subcontractors, sureties, and owners, in both the prosecution and defense of claims on public and private construction projects. In her construction practice, she has represented and counseled contractors in cases involving federal and state Miller Act and Prompt Payment Act claims, complex contractual disputes, compliance concerns, litigation, settlement, and dismissal of claims. View articles by Lee-Ann.

Read more about Lee-Ann C. BrownEmailLee-Ann's Linkedin Profile
Show more Show less
Photo of John Mark Goodman John Mark Goodman

John Mark Goodman is a construction lawyer and litigator who has tried cases throughout the United States and abroad. He regularly represents contractors, subcontractors, owners, and others involved with construction disputes, but he also handles a variety of non-construction disputes when called upon.

John Mark Goodman is a construction lawyer and litigator who has tried cases throughout the United States and abroad. He regularly represents contractors, subcontractors, owners, and others involved with construction disputes, but he also handles a variety of non-construction disputes when called upon. A degreed engineer, John Mark enjoys helping clients work through disputes that are often technical and complex.

Read more about John Mark GoodmanEmail
Show more Show less
  • Posted in:
    Business and Commercial
  • Blog:
    BuildSmart
  • Organization:
    Bradley Arant Boult Cummings LLP
  • Article: View Original Source

Call us at 1-800-913-0988 or email sales@lexblog.com.

Facebook LinkedIn Twitter RSS
The Library at LexBlog
  • About LexBlog
  • The Field We Built
  • Library at LexBlog
  • Our Beliefs
  • Our Team
  • Contact LexBlog
  • Disclaimer
  • Editorial Policy
  • Terms of Service
  • Get Started
  • Publishing Solutions
  • Compass
  • Submit a Request
  • Support Center
  • System Status
Copyright © 2026, LexBlog, Inc. All Rights Reserved.
Law blog design & platform by LexBlog LexBlog Logo